- A design if needed to be modified more than thrice shall be charged for accordingly.
- Government fees for the liaison bodies to be paid directly by the client.
- The complete fee payment for plan sanction in Panchayat limits need to be borne by the client.
- Assuming the site & road level to be equal, if the ground level needs to be raised above 18″, it shall be charged for accordingly.
- Hard rock / soft rock excavation, if it arises shall be charged for accordingly.
- Buying new earth/sending existing earth excavation/ backfilling purpose shall be charged on actual.
- Basic price of cement is Rs.400/- per bag & Steel is Rs. 65,000/- per MT. Any increase in these prices shall be charged accordingly.
- Percentage of opening for doors & windows – 24% of built up area Maximum.
- Any work not mentioned within this package or outside the site boundary shall be charge for accordingly.
- One point of Electricity & water needs to be provided by the client free of cost to facilitate construction.
- SBC of soil is considered at 180 KN/ M2 and depth of the foundation considered at 5 feet, any increase in depth shall be charged accordingly on actuals upon site conditions.
- If there are constraints in materials delivery or socking place and materials to be order in small quantities, the additional charges for the same shall be charged on actuals.
- A specific area to construct labour and materials shed needs to be provided within 50 feet from the construction place by the client.
- Any road cutting charges for the connection of Electricity and sewage lines is not included, such work shall be charged additionally.
- Soil testing is not included in package.
- Interiors are not included in package.
- Electrical and Meter Box are not included.
- Borewell is not included in package.
NOTE: The above mentioned materials specifications are generalized, the inclusion or the exclusion of the same shall vary depending on the floor plan.